Project Lists

Below you will find two lists. The first is a list of projects we have completed since moving in and the second is our list of project that are on the “To Do” list. We will update these lists as we complete more projects, so check back soon!

Completed Projects

Living Room:

  • Rebuilt 1 wall and re-painted
  • Replaced window’s
  • Replaced front door
  • Updated and added electrical outlets and light switches, new outlet/switch covers
  • Installed ceiling fan and recessed lighting
  • Installed Surround Sound & mounted TV
  • Installed cabinets
  • Made and put up curtains
  • Textured ceiling

Dining Room:

  • Rebuilt 1 wall, removed wallpaper & painted
  • Textured ceiling
  • Replaced window’s
  • Updated electrical and light switch, new outlet/switch covers
  • Replaced light fixture

Kitchen:

Master Bedroom:

  • Removed wallpaper & painted
  • Replaced window
  • Updated electrical and light switches, new outlet/switch covers

Second Bedroom:

Bathroom:

  • Replaced door knob
  • Replaced bathtub seal
  • Painted
  • Installed fan vent to outside (it previously vented into our attic)
  • Replaced mirror

Hallway:

  • Painted
  • Replaced light fixture
  • Re-painted (new color)
  • Putty up and Paint ceiling

Basement:

  • Sump pump installed
  • Crack filler injected into basement wall
  • Re-built 1 wall
  • Purchased new Washer and Dryer

Exterior:

  • Replaced Siding
  • Replaced Roof
  • Updated Light Fixtures
  • Added Lighting

Outside:

  • Replaced 1/3 of our 6′ wood privacy fence

 

Remaining Projects

Living Room:

  • Finish trim work (baseboard, crown molding, window trim, entry door trim)
  • Rebuild fireplace hearth box & finish fireplace (stone, mantel)
  • Hang artwork (perhaps make it as well)
  • New furniture

Dining Room:

  • Replace flooring
  • Finish trim work (baseboard, window trim)
  • Make curtains
  • Hang artwork

Kitchen:

  • Replace outlets and light switches, add light switch, new outlet/switch covers
  • Replace flooring
  • Replace counter tops
  • Replace sink
  • Install a dishwasher
  • Clean & paint door to basement

Master Bedroom:

  • Re-build 2 walls
  • Replace door knob
  • Paint ceiling
  • Finish trim work (baseboard, crown molding)
  • Carpet/ Large area rug
  • Put up some more hooks and shelving
  • Mount TV

Second Bedroom:

  • Paint closet and Install closet organization system
  • New curtains
  • Decorate

Bathroom:

  • Gut and re-drywall (including painting)
  • Replace window
  • Replace floor
  • Install bubble skylight
  • Install new tub/ shower (including tile)
  • Install new sink
  • Replace door with sliding, pocket door (if possible)

Office:

  • Gut and re-drywall (including painting) (if possible combine with master)
  • Replace doors & install new dog door
  • Replace flooring
  • Replace light fixture
  • Replace windows

Hallway:

  • Paint closet doors
  • Change artwork

Basement:

Short-Term

  • Finish re-dry walling (including laundry room)
  • Paint
  • Fix ceiling tiles
  • Area rug
  • Reorganize for optimum storage space
  • Make cat shelves
  • Move washing machine and put up shelving

Long-Term

  • Gut, Seal and Finish Basement
  • Divide space into sections: Laundry, Utility, Bedroom, Bathroom, Entertainment & Bar
  • Install a second bathroom in the basement
  • Create a bedroom (includes egress window installation)
  • Make new bar and entertainment area
  • Make under stair installation (pinned on pinterest)

Exterior:

  • Rebuild Porches
  • Replace Stone Veneer

Outside:

  • Complete re-landscaping (grading, plants, etc)
  • Pave driveway, walkway & patio
  • Finish re-doing fence
  • Rebuild garage
  • Install koi pond (this may be more of a dream of mine than reality)
  • Create a garden space
Print Friendly, PDF & Email